Case Study: Caterpillar Clayton, North Carolina Project Summary Replace existing legacy lighting system consisting of 250w, 400w, and 1000w metal halide fixtures with LED exterior fixtures. Footcandle readings averaged: Before Footcandle readings averaged: After...
Case Study: Big V – Lexington Town Center Lexington, South Carolina Project Summary Replace existing legacy lighting system consisting of 1000w metal halide pole lights, 175w and 250w metal halide canopy lights, and 400w metal halide wallpacks with 300w LED pole...
Case Study: Avery Plaza Fort Mill, South Carolina Project Summary Replace existing legacy lighting system consisting of 1000w metal halides with 292w and 153w Cireon LED exterior parking lot fixtures. Footcandle readings averaged: Before Footcandle readings averaged:...
Case Study: All American Relocation Charlotte, North Carolina Project Summary Replace existing legacy lighting system consisting of 400w metal halide fixtures with 104w LED highbay fixtures. Footcandle readings averaged: Before Footcandle readings averaged: After All...
Recent Comments